SDM530Modbus 10(100)A,Modbus RTU,Measure kWh Kvarh, KW, Kvar, KVA, P, F, PF, Hz, dmd, V, A, Three Phase Din Rail Energy Meter

$3.00

  • Dimensions:126*130*65mm
  • Output Voltage:230/400(3~)
  • Phase:Three Phase
  • Measuring Energy Range:999999.99kwh
  • DIY Supplies:Electrical
  • Accuracy Class:Class 1
  • Max Operating Current:80A – 99A
  • Display Type:Digital Only
  • Rated Voltage:220V
  • Power Supply:AC
  • Model Number:SDM 530Modbus
  • Use Only Insulating tools
  • Do not connect while circuit is live
  • Place the SDM530Modbus meter only in dry surroundings
  • Don’t mount the SDM530Modbus meter in a explosive area
  • Make sure the wires are suitable for the maximum current of the meter.
  • Make sure the AC wires are connected correctly before activating the current/voltage to the meter.
  • Don’t touch the meter connecting clamps directly with metal, blank wire and your bare hands as you may get electrical shock.
  • Make sure the protection cover is placed after installation.
  • Never open the meter case , don’t drop or allow strong physical impact on the meter.

Description

Dear Customers:

Pls read following information before the Russia customers buy:

Due to the adjustment of the Russian postal policy, the buyer’s name of the consignee must fill in the full name to get the normal, trouble to provide the correct and complete name and company name, as well as address. We will not be responsible for any return due to incorrect name

TKS.

 

1. About Shipping:

a) China Post Registered Air Mail

China Post Registered Air Mail really would take a long time, as we have experienced, usually, it would takes around 1 to 2 months, sometimes even more than 2 months. and it maybe lost during shipping.

So pls consider before you choose CPAM that whether you can wait for such a long time with patience or not. WE CONFIRM TO BE DELIVERED IN 65 DAYS, if the delivery date is over 65 days, we’d like to refund. but if it is no more than 65 days, we do not accept any dispute. before the purchase protection is running out, you can ask us to extend the delivery date first.

BTW, for the customers in Russia, pls leave your full name on delivery information. TKS!

 b) FedEx / DHL

If you choose FedEx or DHL, pls leave the correct delivery address and phone number, and inform if we should lower the declared value. Or we will declare the total value.

BTW, it would be better if you also leave your company’s name on address. Many Thanks!

 

2. About Products:

a) In default, all the meter works under 220/230V, if need 110V version, pls ask our service online first. Some links are 110V meter, pls pay attention!!

b) If MID version required, pls leave a message, or in default, non-MID version will be sent. The function of both is same.

c) If you have received and satisfied with our products, pls give us 5 stars! Your satisfaction is our motivation.

 

3. About Dispute:

a) If your goods is still in transit by CPAM, and the delivery date is no more than 60 days, pls wait with patience.

b) If your goods is held by custom, pls contact the custom at your local and come to us for extending the delivery date.

Reviews

There are no reviews yet.

Be the first to review “SDM530Modbus 10(100)A,Modbus RTU,Measure kWh Kvarh, KW, Kvar, KVA, P, F, PF, Hz, dmd, V, A, Three Phase Din Rail Energy Meter”

Your email address will not be published. Required fields are marked *